Solar PV System Safety Standards (SANS 10142)

Comprehensive overview of South African electrical standards for safe solar PV installation and compliance.

Solar installation
[ AdSense Ad – 728x90 ]
10142-1
Wiring Code
CoC
Mandatory
0
Insurance if Non-Compliant
SAPVIA
Gold Standard

Introduction

SANS 10142 (The Wiring of Premises) sets mandatory electrical installation standards in South Africa. Solar PV systems must comply to ensure safety, reliability, and insurance coverage — non-compliance can result in claim denials, fines, or forced removal.

Key SANS 10142 Requirements for Solar

Critical clauses from SANS 10142-1:2021 (Edition 3) applicable to PV systems.

Cabling & Connectors

  • Solar Cable: 4–6 mm², double-insulated, UV-resistant (SANS 1507)
  • MC4 Connectors: IP67, rated 30A, genuine (not fake)
  • Conduit: UV-stabilized PVC or metal (roof penetrations)
  • Labeling: "PV Array" every 3m + warning stickers

Earthing & Lightning Protection

  • Earth Rod: 1.5m copper, <10 Ω resistance
  • Equipotential Bonding: Rails + inverter + DB
  • SPD (Surge Protection): Type 2 DC & AC (Dehn, Citel)
  • Lightning Risk: LPS if >10m height or high keraunic area

Overcurrent & Surge Protection

  • DC Fuses: gPV 15A per string
  • DC Isolator: IMO or Santon, lockable
  • MCB/RCBO: Type A or B, 30mA RCD
  • Surge Arrestors: Replaceable cartridges, visual indicator

Inverter Certification & Placement

  • NRCS LoA: Mandatory for all inverters
  • NRS 097-2-1: Grid code compliance
  • IP65: Outdoor or garage install
  • Clearance: 300 mm all sides, shaded wall

Installer Certification

Only licensed electricians can carry out installations. Compliance certificates are required for inspection and insurance.

ECSA

Registered Professional

SAPVIA

Gold Installer

CoC

2-Year Validity

Inspection and Approval

Municipal inspectors verify adherence to SANS 10142 before grid connection or issuing compliance certificates.

  • Pre-Commission Test: Insulation resistance >1 MΩ, polarity, earth loop
  • Inspector Checklist: CoC, as-built drawings, component certs
  • Timeframe: 1–3 weeks post-install
  • Rejection Risk: 40% on first visit (common: poor labeling, no SPD)

Warning:

No CoC = no grid connection, no insurance, no resale value.

Free SANS 10142 Solar Checklist

Download our installer-ready PDF checklist — used by 500+ SAPVIA pros.

Download PDF

Conclusion

Following SANS 10142 ensures safe, legal, and reliable operation of your solar PV system. Use only NRCS-approved components, SAPVIA installers, and insist on a valid CoC — it’s your protection and proof.